Open-plan internal alterations in a traditional Edinburgh tenement

Edinburgh houses, flats & tenements

Internal alterations that make your whole home work better.

Reconfigure awkward rooms, connect kitchen and living spaces, add an en-suite or recover a forgotten box room—with the structure, services and original character considered from the start.

Start here

Tell us about your property

A short outline, address and your main goal are enough to begin.

This simple CAPTCHA helps stop automated spam. No tracking is used.

No obligation. Your details are used only to respond to this enquiry.

Quick answer

Yes, many Edinburgh homes can be dramatically improved without extending. The right internal alteration starts by understanding load-bearing walls, drainage, fire safety, shared structure and any listed features before fixing the new layout.

Design around the real problem

What could this project unlock?

Each option starts with the life you want the home to support, then tests structure, consent and budget against that goal.

A kitchen cut off from daily life

Relocate or open up the kitchen so cooking, dining and family space work together.

A box room with no clear purpose

Test whether it can improve a kitchen, add storage, become a study or support an en-suite.

Rooms that are large but inefficient

Rebalance circulation, doors, storage and furniture so the existing floor area earns its keep.

Period detail at risk

Keep the cornices, fireplaces, principal rooms and character that matter while changing what does not.

Edinburgh-specific thinking

Tenement alterations need more than an open-plan sketch.

Traditional Edinburgh flats can involve shared structure, long service routes, principal rooms, box rooms, communal access and sensitive original fabric. A measured survey and early structural thinking help distinguish a bold idea from a buildable one.

Check Edinburgh Council’s home-alteration consent guidance

A straightforward service

Choose the level of help the project needs.

01

Feasibility & survey

Define the brief, understand the property and test whether the main idea stacks up.

02

Concept design

Compare layouts, priorities and trade-offs before committing to one direction.

03

Permissions & warrant

Prepare and coordinate the information needed for the project’s consent route.

04

Construction support

Develop clearer information for pricing and help respond to questions as the build progresses, where included.

Common questions

Answers before the first drawing.

These are general starting points. Your address, property status and precise work determine the actual route.

Many structural changes and other building works require a building warrant. The answer depends on the precise scope, and work that does not need a warrant must still meet applicable building standards. We establish the likely consent route before design progresses.

A clearer next step

Make sense of your project.

Talk through what you want to change, the constraints worth checking and the most useful route forward for your home.

Start here

Prefer to write?

Send the essentials and you can expect a reply within one working day.

This simple CAPTCHA helps stop automated spam. No tracking is used.

No obligation. Your details are used only to respond to this enquiry.